Facade Cladding
About the Project
Grupo Seven wanted facade cladding that would give the development's entrance buildings a stronger visual identity, combining contemporary aesthetics with low maintenance. Instalar installed WPC Arkowood K sun louvers, pairing the look of wood with the durability of a composite material, with the work carried out entirely by our in-house team.
- WPC Arkowood K Sun Louvers: a finish that reproduces the look of wood, with greater durability.
- Mounting Structure: in-house structure, engineered for the development's entrance buildings.
- Uniform Finish: low-maintenance cladding that withstands weather conditions.
- In-House Execution: design, fabrication and installation carried out by the Instalar technical team.
- Defined Schedule: work completed within the schedule agreed with the client.
115m²
of facade area
60 days
construction time
3
professionals involved
100%
in-house execution
Result
The new cladding gave Grupo Seven's entrance buildings a more modern look in line with the development's standard, with the durability and low maintenance of WPC Arkowood K.